Friday, February 7, 2014

Built in: Cabinet Assembly

A post of pictures

The shop. AKA: the living room and dining room

Test fit

Lowers labeled and ready to go

Actual fit needs a little wall modification

Lowers 1, 2, and 3 in place.  The chimney is about 2 inches out of plumb which messed up the design.  I wasn't expecting it to be so out.

Dust storm


Modified to allow for heat release.

Leveled and installed.  That took longer than expected.



Fortunately, television superstar "Kit" from Knight Rider showed up to help me out.
Clamping together for begin of install

Install

After planing, red oak boards on top.


Time to inspect for which boards go where

Lookin good



No comments:

Post a Comment